Jeep Grand Cherokee

1993-1999 of release

Repair and car operation



Jeep Grandee Cheroki
+ Jeep Grand Cherokee brand Cars
+ Settings and routine maintenance
+ Ryadny six-cylinder engine
+ V8 Engine
+ Procedures of the general and major maintenance of the engine
+ Systems of cooling, heating and air conditioning
+ the Power supply system and production of the fulfilled gases
+ System of electric equipment of the engine
+ Systems of decrease in toxicity of the fulfilled gases and engine management
+ Manual box of gear shifting
+ Automatic transmission
+ Transfer case
- Coupling and transmission line
   General information
   Coupling - the general description and check of serviceability of functioning
   Removal and installation of components of hydraulic system of switching off of coupling
   Removal, check of a condition and installation of components of coupling
   Removal, check of a condition and installation of the vyzhimny bearing of coupling
   Check of a condition and replacement of the directing bearing
   Driveshafts, differentials and bridges - the general information
   Check of a condition of the transmission line
   Removal and installation of driveshafts
   Replacement of kardanny hinges
   Replacement of an epiploon of a shaft of a leading gear wheel of differential
   Removal, service and installation of a nave and bearings (forward wheel)
   Removal, major maintenance and installation of a forward power shaft
   Removal and installation of assembly of the forward bridge
   Removal and installation of a back semi-axis and bearing assembly
   Removal and installation of assembly of the back bridge
+ Brake system
+ Suspension bracket and steering
+ Body
+ System of onboard electric equipment
+ Governing bodies and operation receptions


Removal and installation of assembly of the forward bridge

This procedure is equally applicable to models as 2WD, and 4WD. At work on not all-wheel drive model lower superfluous steps.

Removal

 PERFORMANCE ORDER

  1. Weaken nuts of forward wheels, поддомкратьте a front of the car and establish it on props. Remove forward wheels.
  2. To Otboltita supports of forward brake mechanisms also tie up them aside by means of wire pieces - watch that that brake hoses did not appear tense (Head Brake system).
  3. Remove brake shoes, brackets of supports and brake disks (Head Brake system).
  4. Mark position of the forward driveshaft in relation to a shaft of a leading gear wheel of differential, then disconnect the driveshaft from the holder of a crosspiece of a shaft of a leading gear wheel (The section Check of a condition of the transmission line). Throw out collars of the holder of a crosspiece.
  5. Disconnect a stabilizer bar from arms on the bridge (Head the Suspension bracket and a steering).
  6. Disconnect steering drafts from levers of rotary fists (Head the Suspension bracket and a steering). Tie up them aside to elements of the bottom of the car pieces of a wire.
  7. To Otboltita the bottom ends of shock-absorbers from the bridge.
  8. Remove a steering damper (Head the Suspension bracket and a steering).
  9. Remove the ABS sensor (if it is provided) (for more details see. Head Brake system).
  10. Get under differential a hydraulic jack. At possibility of use of two jacks, one of them place under the right sleeve of the bridge for balancing of assembly (4WD). On 2WD models place a jack on the center of assembly of the bridge.
  11. To Otboltita from the bridge the top and bottom levers of a suspension bracket (Head the Suspension bracket and a steering).
  12. Slowly omit assembly on the earth.

Installation

Installation make upside-down. Lifting the bridge in adjusting situation, take care of the correct landing of screw springs. Do not forget to replace collars of the holder of a crosspiece. Tighten with demanded effort the fixture mentioned in Specifications.