|
Jeep Grand Cherokee1993-1999 of releaseRepair and car operation |
|
Jeep Grandee Cheroki + Jeep Grand Cherokee brand Cars + Settings and routine maintenance + Ryadny six-cylinder engine + V8 Engine - Procedures of the general and major maintenance of the engine General information Major maintenance of the engine - the general information Check of kompressionny pressure in cylinders The diagnostic checks made by means of the vacuum gage Methods of removal of the engine and necessary precautionary measures Removal and engine installation Options of restoration of the engine Order of dismantling of the engine Dismantling of a head of cylinders Cleaning and check of a condition of a head of cylinders Service of valves Assembly of a head of cylinders Removal of shatunno-piston assemblies Removal of a cranked shaft Cleaning of the block of the engine Check of a condition of the block of the engine Honingovaniye of cylinders Check of a condition of shatunno-piston assemblies Check of a condition of a cranked shaft Check of a condition of radical and shatunny bearings Engine assembly order after completion of its major maintenance Installation of a cranked shaft and check of gaps of radical bearings Installation of piston rings Installation of shatunno-piston assemblies and check of gaps in shatunny bearings The first start of the engine after major maintenance + Systems of cooling, heating and air conditioning + the Power supply system and production of the fulfilled gases + System of electric equipment of the engine + Systems of decrease in toxicity of the fulfilled gases and engine management + Manual box of gear shifting + Automatic transmission + Transfer case + Coupling and transmission line + Brake system + Suspension bracket and steering + Body + System of onboard electric equipment + Governing bodies and operation receptions |
Order of dismantling of the engine It is simplest to make engine dismantling at the portable assembly stand. Such stand usually cheaply can be rented in a workshop of car-care center or special point of hire. Before establishing the engine on the stand from it it is necessary to remove a flywheel / a driving disk. If possibility to use the stand is absent, it is possible to make engine dismantling after installation it on wooden blocks directly on a floor of a working platform. Observe extreme care not to overturn the engine on a floor during such dismantling. If you decided to get and establish the restored engine, first of all it is necessary to remove with old all hinged units and auxiliaries - they should be then are transferred on the new block - as though you were going to start major maintenance of the old engine. Here enter:
If you are going to make installation of the reduced set of the block (see. The section Options of restoration of the engine), should be removed from the old engine a head (and) cylinders, the pallet of a case and the oil pump. If carrying out complete major maintenance is planned, the engine should be disassembled and from it all internal components are taken. Adhere to the following order of removal of internal components of the engine:
Before the beginning of dismantling of the engine and performance of procedures of its major maintenance make sure available listed below components (see also lists of tools provided in the Section the Assembly order of the engine after completion of its major maintenance):
|
|