Jeep Grand Cherokee

1993-1999 of release

Repair and car operation



Jeep Grandee Cheroki
+ Jeep Grand Cherokee brand Cars
+ Settings and routine maintenance
+ Ryadny six-cylinder engine
+ V8 Engine
+ Procedures of the general and major maintenance of the engine
+ Systems of cooling, heating and air conditioning
- Power supply system and production of the fulfilled gases
   General information
   Procedure of dumping of pressure of fuel
   Check of pressure of fuel and functioning of the fuel pump
   Removal and installation of a fuel tank
   Cleaning and repair of a fuel tank - the general information
   Repair and replacement of fuel lines
   Removal and installation of the fuel pump
   Check of serviceability and replacement of the block of the fuel level sensor
   Removal and installation of assembly of an air purifier
   Replacement of a cable of gas
   System of injection of fuel - the general information
   Check of serviceability of system of injection of fuel
   Serviceability check, removal and installation of the case of a throttle
   Check of serviceability and replacement of a regulator of pressure of fuel
   Serviceability check, removal and installation of injectors of fuel
   Check of functioning and replacement of components of system of stabilization of turns of idling (IAC)
   Service of system of production of the fulfilled gases - the general information
+ System of electric equipment of the engine
+ Systems of decrease in toxicity of the fulfilled gases and engine management
+ Manual box of gear shifting
+ Automatic transmission
+ Transfer case
+ Coupling and transmission line
+ Brake system
+ Suspension bracket and steering
+ Body
+ System of onboard electric equipment
+ Governing bodies and operation receptions


Removal and installation of assembly of an air purifier

 PERFORMANCE ORDER

  1. Disconnect a negative wire from the battery.
  2. Uncover an air purifier and an element of the air filter (Head of Control and routine maintenance).
  3. Release the clips, fixing an air inlet sleeve to an air purifier casing.

Components of assembly of an air purifier of engines in volume of 4.0 l.

Components of an air purifier of engines in volume of 5.2 l.
  1. Give bolts of fastening of a casing of an air purifier in an impellent compartment.
  1. Give bolts (shooters) of fastening of a casing of an air purifier in an impellent compartment.
  1. Lift assembly up and disconnect it from a sleeve of a fence of fresh air, then take assembly from an impellent compartment.
  2. Installation make upside-down.